U00011500 |
01'.
An internal error occurred. Please contact our support team.
|
|
U00011501 |
Task '&01' ('&02') can no longer find Workflow/Schedule '&03'. Reason: '&04'
Explanation: A Workflow or Schedule for a particular task could not be found. Thus it was not possible to enter the correct task status in the Workflow or Schedule. Causes: * The schedule was terminated while a child task was running. * The Workflow was terminated and deactivated while a child task was running. * There was an error within the activation. The Workflow has not yet been created.
|
|
U00011502 |
Workflow '&01' (RunID '&02') ended normally.
Explanation: &01 = Workflow object &02 = RunID
|
|
U00011503 |
Workflow '&01' (RunID '&02') ended abnormally.
|
|
U00011504 |
Line between object '&01' / lnr: '&02' (RunID: '&03') and '&04' / lnr: '&05' (RunID: '&06') is already deleted.
|
|
U00011505 |
User '&01' is not authorized to execute object '&02'.
|
|
U00011506 |
The Workflow '&01' has been canceled by user '&02'.
|
|
U00011507 |
Set external dependency: '&01' / RunID: '&02' INACTIVE - no instance has run with this logical date.
|
|
U00011508 |
Cannot find line '&01' in Workflow '&02'.
|
|
U00011509 |
Workflow object ('&01/&02') is not in a 'blocking' status.
|
|
U00011510 |
Workflow '&01' is not active. Releasing blocking status is not possible.
|
|
U00011511 |
Workflow '&01' (RunID '&02') is not in 'running' status - 'start immediately' is not possible.
|
|
U00011512 |
The 'auto-deact' flag will be deleted in Workflow '&01'. Status = '&02', line = '&03'.
Meaning: A task in a Workflow was ended incorrectly. The mark "Deactivate autom. after finish" is therefore deleted. '&01' = Name of the Workflow '&02' = Status of the task '&03' = Position of the task in the Workflow (column-wise left top to right bottom)
|
|
U00011513 |
Status definition is not numeric: '&01'.
|
|
U00011514 |
Status definition is not ascending (from - to): '&01'.
|
|
U00011515 |
The status definition is incorrectly defined: '&01'.
|
|
U00011516 |
Cannot find status definition: '$01'.
|
|
U00011517 |
Modify Workflow - unknown modification type: '&01'
|
|
U00011518 |
Task '&01' (RunID '&02') is not in a 'waiting' status. Cannot modify.
|
|
U00011519 |
Workflow '&01' (RunID '&02') is modified by '&03'.
|
|
U00011520 |
Runtime modification: User '&03' set a breakpoint at task '&01' (RunID: '&02').
|
|
U00011521 |
Task '&01' is not in 'stopped' status. Cannot modify.
|
|
U00011522 |
Runtime modification: Task '&01' (RunID '&02') has been released by user '&03'.
|
|
U00011523 |
Runtime modification: Task '&01' (RunID '&02') was immediately started by user '&03'.
|
|
U00011524 |
Runtime modification: Latest start time - user '&05' has changed condition for task '&01' (RunID '&02') from '&03' to '&04'.
|
|
U00011525 |
Runtime modification: The task '&01' (RunID '&02') has been set to INACTIVE by user '&03'.
|
|
U00011526 |
Runtime modification: Inactive task '&01' (RunID '&02') has been set to ACTIVE by user '&03'.
|
|
U00011527 |
Properties of task '&01' were modified. Time: from '&02' to '&03'; active flag from '&04' to '&05'.
|
|
U00011528 |
Runtime modification: The WHEN precondition for task '&01' (RunID: '&02') to his predecessor has been modified. Line number: '&03'; WHEN precondition: old: '&04' new: '&05'
|
|
U00011529 |
Runtime modification: At the task '&01' / lnr: '&02' (RunID: '&03') the line to its predecessor '&04' / lnr: '&05' (RunID: '&06') has been deleted.
|
|
U00011530 |
Schedule '&01' (RunID '&02') is being modified by '&03'.
|
|
U00011531 |
Schedule '&01' ('&02') modified successfully.
|
|
U00011532 |
Modify schedule: unknown modification type: '&01'.
|
|
U00011533 |
Cannot find process line '&01' in schedule '&02'.
|
|
U00011534 |
Properties of task '&01' were modified. Time: from '&02' to '&03' (User: '&04')
A running Schedule object was modified: &03 current start time of the corresponding scheduled task &04 if the task is active 0 not active 1 active
|
|
U00011535 |
Object '&01' will not be started. Planned starting time is in the past.
|
|
U00011536 |
Properties of task '&01' were modified. Start time: from '&02' to '&03' ; Logical date: from '&04' to '&05' ; Active-flag: from '&06' to '&07'
|
|
U00011537 |
Workflow/Schedule '&01' (RunID '&02') could not be copied to the statistics, AH not found.
|
|
U00011538 |
Task '&01' should be started immediately (User: '&02').
|
|
U00011539 |
Properties of task '&01' were modified. The task was set active (User: '&02').
|
|
U00011540 |
Runtime modification: Blocking status of task '&01' (RunID '&02') has been released by user '&03'.
|
|
U00011541 |
Restart for task '&01' (RunID '&02') was processed. Reference RunID: '&03'; Options: '&04'; Workflow/Schedule: '&05'
&01 RunID of the restarted object &02 Script started from the restart point &03 Flags GEN_JCL The generated JCL was displayed in the activation protocol ORIGINAL_SCRIPT The original script was displayed in the activation protocol VAR_MOD The modifications of variables were displayed in the activation protocol ATT_MOD The modifications of attributes were displayed in the activation protocol ATT_DIALOG The attribute dialog was activated MAN_RELEASE The object is waiting for manual release KEEP_STARTTYPE Keep start type
|
|
U00011542 |
Automatic restart for '&01' is noted because of RESULT-condition.
|
|
U00011543 |
Structure of task '&01' is not ascending.
|
|
U00011544 |
Max. runtime of task '&01' (RunID '&02') has been exceeded. Task '&03' will be started.
|
|
U00011545 |
Max. runtime of task '&01' (RunID '&02') has been exceeded. Task will be canceled or terminated respectively.
|
|
U00011546 |
Properties of task '&01' were modified. The task was set inactive (User: '&02').
|
|
U00011547 |
Time Checkpoint for task '&01' (RunID '&02') has been exceeded. Task '&03' will be started.
|
|
U00011548 |
Runtime of task '&01' (RunID '&02') has not reached the min. runtime limit. Task '&03' will be started.
|
|
U00011549 |
'&04' property in Workflow '&01' (RunID '&02') is modified by '&03'.
|
|
U00011550 |
Check-Point Time is not numeric: '&01'.
|
|
U00011551 |
Check-Point Time is not numeric: '&01'.
|
|
U00011552 |
Runtime modification: Check point for task '&01' (RunID: '&02') has been modified. Time= old: '&03' new: '&04', Execute= old: '&05' new: '&06'
|
|
U00011553 |
CHECKPOINT of '&01' (RunID ''&02') has been deleted.
|
|
U00011554 |
Runtime modification: User '&03' has set task '&01' (RunID '&02') INACTIVE. WARNING: The alarm defined in the 'Dependencies' tab has been turned off.
Explanation: The "Dependencies" tab is available in the properties of the ProcessFlow task. Its included setting "Execute" is ignored because the task to be set inactive includes the activated option "skip". (The setting "Execute" may be used to specify an object that should be executed if the defined dependency condition does not occur).
|
|
U00011555 |
Schedule: '&01' / object '&02' will not be started. Automatic processing has been stopped.
|
|
U00011556 |
Runtime modification: Inactive task '&01' should be started immediately - task generation in progress
|
|
U00011557 |
The Job '&01' (RunID: '&02') is already being started.
|
|
U00011558 |
Cannot find status definition: '&01', object '&02' was not deactivated automatically.
|
|
U00011559 |
Status definition is not numeric: '&01', object '&02' was not deactivated automatically.
|
|
U00011560 |
Schedule '&01' (RunID '&02') can't start object '&03'. See following message:
|
|
U00011561 |
Runtime modification: Latest start time - user '&05' has changed condition for task '&01' (RunID '&02') from '&03' to '&04'.
|
|
U00011562 |
Runtime modification: Latest start time - user '&05' has changed condition for task '&01' (RunID '&02') from '&03' to '&04'.
|
|
U00011563 |
User '&02' removed breakpoint of object '&01'.
|
|
U00011564 |
Inactive task '&01' should start immediately, activation was kicked, Workflow activation will continue.
|
|
U00011565 |
Task '&01' is in 'inactive calendar' status. Cannot modify.
|
|
U00011566 |
Automatic Deactivation delay at '&01'
Explanation: This is an internal message which serves testing purposes, can be seen in the report.
|
|
U00011567 |
Maximum number of calendar conditions (50) exceeded ! Currently, up to 50 conditions can be handled.
Schedule monitor: the function for calculating the next execution could not be executed correctly -> no runtime limitation.
|
|
U00011568 |
Task '&01' was added to '&02' (RunID '&03') during runtime with time '&04' (User: '&05').
|
|
U00011569 |
Task '&01' was added to '&02' (RunID '&03') during runtime with time '&04'. Start time has already been exceeded. (User: '&05')
An attempt was made to start a task in the past. The task is found in UC_SYSTEM_SCHEDULE with status ENDED_TIMEOUT (start time exceeded).
|
|
U00011570 |
Schedule '&01' (RunID '&02' ) - Period/Period turnaround has changed. Tasks will not be reloaded!
You tried to reload a Schedule with a new time period/start time.
|
|
U00011571 |
External dependency: '&01' / lnr: '&02' satisfied by RunID: '&03'.
|
|
U00011572 |
JP cancel initiated by ELSE condition of external condition: '&01'.
|
|
U00011573 |
Lead time satisfaction type is invalid ('&01'), LTSType modified to: 'Since last run'.
|
|
U00011574 |
External dependency: '&01' / Lnr: '&02' satisfied by Workflow RunID: '&03' / task RunID: '&04' / Lnr: '&05'.
|
|
U00011575 |
External dependency: '&01' / Lnr: '&02' set INACTIVE by Workflow RunID: '&03' / Lnr: '&04' due to Calendar conditions.
|
|
U00011576 |
The dependency between object '&01' / lnr: '&02' (RunID: '&03') and '&04' / lnr: '&05' (RunID: '&06') is already processed - cannot delete line.
|
|
U00011577 |
Task '&01' (RunID '&02') was restarted (User: '&03').
|
|
U00011578 |
Object '&01' of type '&02' (RunID '&03') was canceled recursively by parent '&04', RunID '&05'.
|
|
U00011579 |
The date for the next period check was a thing of the past and was corrected automatically.
|
|
U00011580 |
JPEXECPU module closed. Total time: '&01' seconds.
|
|
U00011581 |
External dependency: '&01' / Lnr '&02' was satisfied by state '&03', Parent RunID: '&04'
|
|
U00011582 |
GO for Task '&01'/Lnr '&02' not possible. Latest start/endtime already exceeded. Remove latest start/endtime beforehand to start task with GO.
|
|
U00011583 |
LOOP start with '&01' iterations.
|
|
U00011584 |
Iteration '&01' with value '$02'.
|
|
U00011585 |
LOOP end.
|
|
U00011586 |
Missing final action in <IF>.
|
|
U00011587 |
Cannot find task '&01' in Workflow '&02'.
|
|
U00011588 |
Cannot find ForEach definition for Workflow '&01'.
|
|
U00011589 |
No Variable object was defined in the ForEach workflow '&01'.
|
|
U00011590 |
The validity period for the external dependency '&01' has been reduced from '&02' to '&03' due to the last workflow execution.
The validity period for the external dependency '&01' has been reduced from '&02' to '&03' due to the last workflow execution.
|
|
U00011591 |
Latest starttime of task '&01' (RunID '&02') has been exceeded.
|