The first step in preparing to install or upgrade your Automic Workload Automation system is making sure that you have the necessary infrastructure ready and required components and versions installed.
In order to install and run your intended system or update an existing one successfully you have to check requirements and prerequisites.
It is a databaseA database is an organized collection of data including relevant data structures. we constantly maintain and keep up-to-date.
Please check all Automic components and prerequisites for vendor, version or setup information.
Details on necessary preparations and prerequisites you find on the pages New Installation or Upgrade Installation.
Sizing an AWA system is no easy task, as a number of aspects have to be considered. To help you make your decisions, below you find a table for different workload options and a second table containing the most important considerations as Q&A.
The first table is meant to help you to make a quick rough estimate for your system setup. It shows conservative results to be on the safe side.
Database systems and database storage have always to be fail safe and redundant. This section does not deal with that question.
Modules |
Small Config |
Medium Config |
Big Config |
High End Config |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
CPU |
Memory |
Disk |
|
CPU |
Memory |
Disk |
|
CPU |
Memory |
Disk |
|
CPU |
Memory |
Disk |
|
Automation Engine |
2 x |
4 Cores |
8 GB |
512 GB |
2 x |
8 Cores |
32 Gb |
1 TB |
2 x |
16 Cores |
64 GB |
1 TB |
4 x |
16 Cores |
96 GB |
1 TB |
Database |
|
4 Cores |
8 GB |
512 GB |
|
8 Cores |
32 Gb |
1 TB |
|
16 Cores |
64 GB |
2 TB |
|
16 Cores |
96 GB |
2 TB |
Utilities |
1 x |
1 Core |
n/a |
20 Gb |
1 x |
1 Core |
n/a |
20 Gb |
1 x |
1 Core |
n/a |
20 Gb |
1 x |
1 Core |
n/a |
20 Gb |
Agent |
n x |
1 Core |
n/a |
20 Gb |
n x |
2 Core |
n/a |
20 Gb |
n x |
4 Core |
n/a |
20 Gb |
n x |
4 Cores |
n/a |
20 Gb |
n x |
1 Core |
n/a |
1 Gb |
n x |
1 Core |
n/a |
1 Gb |
n x |
1 Core |
n/a |
1 Gb |
n x |
1 Core |
n/a |
1 Gb |
|
Service Manager Dialog |
1 x |
1 Core |
n/a |
1 Gb |
1 x |
1 Core |
n/a |
1 Gb |
1 x |
1 Core |
n/a |
1 Gb |
1 x |
1 Core |
n/a |
1 Gb |
User Interface |
n x |
1 Core |
8 GB |
20 Gb |
n x |
1 Core |
8 GB |
20 Gb |
n x |
1 Core |
8 GB |
20 Gb |
n x |
1 Core |
8 GB |
20 Gb |
Enterprise Control Center |
1 x |
4 Cores |
8 GB |
20 Gb |
1 x |
8 Cores |
16 GB |
20 Gb |
1 x |
8 Cores |
16 GB |
20 Gb |
1 x |
8 Cores |
32 GB |
20 Gb |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Number of |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Users |
< 10 |
< 50 |
< 200 |
> 200 |
||||||||||||
Agents |
< 20 |
< 100 |
< 1 000 |
> 1 000 |
||||||||||||
Object definitions |
< 1 000 |
< 50 000 |
< 100 000 |
> 100 000 |
||||||||||||
Total Executions per day |
< 350 000 |
< 700 000 |
< 1 500 000 |
> 1 500 000 |
Adjustments - Questions and Answers
After you have got a rough estimation of what to expect, there are some additional aspects to be taken into consideration, which may affect the sizing. Below you find a list of possible questions and the appropriate answers concerning system sizing for different scenarios.
Question |
Sizing Adjustment |
---|---|
General |
|
Is the expected load distributed over the day evenly or do you expect high peaks? |
Normal: - |
Is excellent performance important even in periods of peak load? |
No: - |
Is the expected load constant or do you expect growth? |
Constant: - |
How long do you need to hold data (statistics, job reports, revision reports) in the database? |
> 12 month: Add more database storage |
Do you expect many huge job reports to be stored in the database (e.g. more then 100.000 lines)? |
No: - |
Do you plan to use ILMStands for Information Lifecycle Management, which refers to a wide-ranging set of strategies for administering storage systems on computing devices.? |
Yes: Plan how to deal with switched out data |
Do you plan to use Oracle as database system? |
Yes: Add resources on the database node(s) (faster CPU's, faster network, ... ) |
What hardware to you plan to use for the AE system? |
Linux/Windows on Intel x64: - |
Do you plan to run the AE/database on virtual nodes? |
Yes: Make sure that computing power is guarantied for you systems and other Virtual Machines do not detract from the computing power/bandwidth. |
Is logging and trace ability over a longer period important for you? |
Y: - |
Fail safe |
|
Is a fail safe system important for you? |
No: - |
Performance during a failure situation (e.g. one node fails): Are the remaining node(s) able to handle the load? |
Example: If fail safe is crucial for you, consider to run on more than two nodes! |
Agents |
|
Do you expect high usage of some agents? |
No: - |
Do you plan to run many agents on a single node (e.g. SAP, WebService,...) |
No: - |
User |
|
Do you have many users, who are constantly monitoring activities and workflows? |
No: - |
Do you expect huge workflows (> 1000 tasks per workflow)? |
No: - |
Do you expect huge xml imports/exports? |
No: - |
Do you expect to have users in different locations (long distance)? |
No: - |