Several finishing activities are required at the end of processing. These include executing Post Process contents, transferring the report and completing the statistical report.
Steps |
Description |
---|---|
Job report |
Job reports can be stored in the AE databaseA database is an organized collection of data including relevant data structures. or the file system. Settings are specified in the Host Attributes tab. |
|
|
Post Process |
The Post Process tab can be used to read the report and to react to a task's result. Job and RemoteTaskManager have a Post Process tab. |
|
|
Minimum runtime |
An alert object can be activated if the processing time did not meet the expected value. The relevant options are provided in the Runtime tab. |
See also:
Executing Objects
Stage 1: Activation
Stage 2: Generation
Stage 3: Processing