Runtime Page
Runtime data is necessary for the various planning and monitoring functions available in the system. This data is collected from Real Runtime (RRT) information. Based on this information, the Estimated Runtime (ERT) can be calculated. As a developer and object designer you need this information for scheduling your tasks. You define how to calculate the runtimes of executable objects on their Runtime pages.
This topic describes both the RRT and the ERT. It describes the options you have to calculate the ERT.
This page includes the following:
Overview of Runtime Concepts
Real Runtime (RRT)
The RRT is the period of time during which a task is active, that is, between its start and its end.
The following time lapses are not considered in the task RRT:
- The time it needs for its activation.
- The time it spends with the Waiting for host status.
The last 25 real runtimes of each executable object are saved with the object data. This data is used as basis for the calculation of the Estimated Runtime (ERT). Only the runs that ended with ENDED_OK status are considered.
The smallest possible real runtime amounts to one second. Tasks with a shorter real runtime are rounded up to one second.
Note: Setting the ERT_CALCULATION mode in the UC_CLIENT_SETTINGS system VARA object to BATCH also prevents RRT values from being updated.
Estimated Runtime (ERT)
The ERT is the expected runtime for the next execution of a task. This data is a key value for dynamic runtime monitoring and forecast calculations, as well as for calculating the most recent ending of a task. The ERT is calculated immediately after a task run using its past 25 RRTs.
Important:
- The quality of the ERT calculation is dependent on the available data. In case of a reorganization of the database there could be not enough datasets available. The calculation might be wrong in this case.
- A lot of historical data will be read from the object for the calculation. Therefore this function should be only activated for individual objects, not client-wide.
- If does not often occur that a task runs and ends several times at the same time. In this case it could happen that one of the executions is not included in the ERT calculation. This happens because of the locking mechanisms that are provided in the AE database.
ERT Calculation method for Clients
The UC_CLIENT_SETTINGS system VARA object contains settings that apply Client-wide. In its ERT_METHOD key, system administrators can specify an ERT calculation method to be applied to the objects in the Client. This is the method that is used if you select Method as set in UC_CLIENT_SETTINGS in the Calculation Method dropdown list.
Important! The ERT calculation settings that you define on this page override the default defined in UC_CLIENT_SETTINGS.
Defining the Runtime Page
To Access the Runtime Page
- In the Process Assembly perspective, open the object.
- On the left navigation pane, expand the General page.
- Click Runtime.
To Define the Runtime Settings
-
In the Return Code Handling section you specify the exact statuses (return codes) that tasks must have to be considered as ended normally (ENDED_OK). Optionally, you can also specify that another object should be executed in case the task ends with a different status.
-
To specify the statuses that you want to consider as ENDED_OK, do the following
-
(All objects) Select Consider: Return code and enter the return code in the Return Code for ENDED_OK Status <=. Tasks with a return code equal or smaller than the one you enter here will be consider to complete with the ENDED_OK status.
For Windows Jobs, if the return code is set to -1 in Windows, the Job status is
ENDED_OK
only if the return code equals 0. This allows you to react to protection faults in Windows jobs (for example, return code -1073741819). -
(OS/390 Jobs only) Select Consider: zOS completion code if you want to specify different return codes for each step in an OS/390 Job. Consider the following:
- The completion code is specified as a decimal.
- The allowed codes are 0-2147483647
- You can define ranges by using a hyphen (for example, 0-8). Separate ranges with a comma (for example, 1,2,10-12).
Alternatively, in OS/390 the return code of each step can be compared with an entry in a step list. As result of this checks the job will be evaluated as normally ended or aborted.
This is how return codes are checked when a z/OS job ends:
-
The system verifies if the job completed with an abnormal status (ABEND) caused by the system (first) or a user (second). If so, the job is regarded as aborted and the maximum return code is used.
-
If no step list has been defined, the job's return code is checked and used.
-
If a step list has been defined, the return codes of the individual steps are compared to the step list. Only steps whose return codes are not equal to 0 are checked. Return code 0 always signals OK.
-
If a step is included in the step list, it depends on the definition whether the step is OK or not OK. The first step that is not OK considers the job to be aborted. This step's return code is used as the job's return code.
-
If a step is not included in the step list, its return code must be 0. Otherwise, the job is considered as aborted.
-
You can set the return code using the :MODIFY_STATE script element.
-
-
Optionally, in Otherwise: Execute object specify which object should be executed if that task ends with none of the OK statuses you have just defined. For example, this could be a Notification object that is sent to a particular group of users informing them of the failure.
Note: For File Transfer objects, the actual status of the transfer does not affect its return code. If, for any reason, a file transfer fails, the return code is still 0.
-
-
In the Estimated Runtime (ERT) section you define the method with which to calculate the ERT. You have the following options:
-
Method as set in UC_CLIENT_SETTINGS
Select this option if you want to apply the method and parameters that your system administrator has specified in the UC_CLIENT_SETTINGS VAR object.
-
New objects
There are no past runs for calculating the ERT. Since you need them for forecasts and runtime monitoring, for example, the Current/Fallback ERT fields are enabled to allow you to enter a suggestion. This value is overwritten after the task has completed its first run. It is then replaced by the ERT value that is calculated using the method specified in the VARA object.
-
Already executed objects
After the object has been executed, these fields are disabled and display the current, real values.
To reset them click the Reset Values button below the Runtime Statistics graphic. This enables these fields again.
-
-
Fixed value
In Duration enter a static value and review it from time to time to make sure that it still meets all your requirements.
The Current ERT fields are disabled when the duration is saved.
Note: Forecast always uses the current ERT for forecast calculations. If a fixed value is set, it is used for further task executions but not for the forecast. If you want to use a fixed value, you must reset the ERT calculation first and also after the next execution. The fixed value is also the current ERT.
Important!
Consider the impact of setting the fixed value too high:
- Forecasts: The completed execution is assessed too high because it always starts from the maximum allowed runtime (worst case). Therefore, the forecast cannot give realistic values.
- Minimum runtime monitoring always activates the actions defined in case of Runtime deviation because the RRT is always smaller than the ERT.
- Maximum runtime monitoring never activates the actions defined in case of Runtime deviation because the ERT is never reached.
Consider the impact of setting the fixed value too low:
- Forecasts: The completed execution is assessed too low because the RRT is mostly above the set value. Therefore, the forecast cannot give realistic values.
- Minimum runtime monitoring activates the actions defined in case of Runtime deviation sometimes because the RRT is usually above the specified ERT.
- Maximum runtime monitoring activates the actions defined in case of Runtime deviation much too often because the specified ERT is exceeded.
-
Dynamic
The following dynamic methods are available:
-
Adaptive
This method calculates the ERT proactively (machine learning-based) considering various factors and runtime parameters from previous runs. It relies on historical data and, therefore, database reorganizations affect it.
Enter the Fallback ERT, which is the hard-coded value that is used in case of missing parameters.
Important! For this method to work efficiently there must be enough historical data (at least 30 runs of a task)
Requirements:
-
At least 1 Java-based work process (JWP) must be available.
- An alternative calculation method is defined in the ERT_ADAPTIVE_FALLBACK_METHOD key (UC_CLIENT_SETTINGS) if no JWP is available.
- ERT_ADAPTIVE is set to Y (UC_CLIENT_SETTINGS).
Notes:
- The ERT is not calculated until the JWP is running. This may take a while. In ERT_ADAPTIVE_JWP_TIMEOUT (UC_SYSTEM_SETTINGS), administrator users can define how long the system should wait for the JWP after starting and before an alternative method should be used.
- Tasks that are waiting for the adaptive ERT calculation have the Waiting for ERT status. This applies to tasks for which the minimum or maximum runtime is calculated depending on the ERT.
- Object variables can be used as external factors for calculating the Estimated Runtime of the object with this method.
-
-
Linear regression
This is the default method. It emphasizes runtime increases or decreases.
- If you enter a value in Current ERT, it applies until an ERT is calculated after the next run.
- Enter the No. of past runs that should be used for calculating the ERT. Allowed values: 1 to 25
- To avoid the evaluation of extreme deviations, enter the +ERT Correction. This is the maximum deviation level. If the RRT exceeds this limit, it will not be taken into account in the calculation of the ERT. Additionally, the number of runs to be used can also be specified.
-
Average
Calculation of the average ERT based on the last RRTs of a task. You define here the number of RRTs to be considered.
- If the number of RRTs is too low, the ERT will follow any existing tendency in runtime behavior.
- If the number of RRTs is too large, extreme deviations with RRTs are not emphasized.
To preserve a distance between ERT and the RRT, it is possible to specify a correction value (+ERT Correction). This value is added to the ERTs to ensure that the ERT follows theRRT of a task at the specified distance.
As with the linear regression method, here you can define the Current ERT and No. of past runs. If No. of past runs is set to 0, then the Client settings are used.
In addition, to avoid the evaluation of extreme deviations you can define thresholds in which you want to ignore them. If the real runtime exceeds this limit, it will not be taken into account in the calculation of the ERT:
- Deviation extent: If this limit (in %) of the actual runtime is exceeded, the estimated runtime is ignored.
- Min. runs: Number of past runs to be considered regardless of deviations. Allowed values: 0 to 25.
-
Maximal value
The highest value from the list of RRTs is used to calculate the ERT. If a large number of runs is to be calculated, the ERT immediately adjusts to increasing runtimes. However, if the RRT decreases, this results in a slow adjustment.
For the decreasing tendencies to be recognized faster, the number of runs to be calculated can be reduced.
To preserve a distance between ERT and RRT, a correction value in percent can be defined. This value is added to the ERTs. This allows you to set an alarm only with extreme increases in runtime.
-
-
- The Runtime Statistics section provides a graphical interpretation of the real (in blue) and of the estimated (in green) runtimes that help understand the relationship between both. You can display both at a time, which allows you to compare their behavior, or you can disable one of them by clicking on the corresponding area of the box below the chart.
-
If necessary, click the Reset Values button at the bottom of the graphic. This deletes all your runtime data.
Important!
- Resetting values deletes the runtime data even before saving the object.
- Real runtime data from archived data cannot be restored.
- This function is only useful if you expect major runtime deviations for future runs (for example, you have changed the task).
-
In the Max & Min Runtime section activate Monitor MRT and/or Monitor SRT if you want to monitor the maximum and/or the minimum runtime. The following calculation methods are available:
-
Fixed value: Enter a fixed duration.
-
ERT + additional duration / ERT - additional duration
Select this option to add or subtract the ERT duration time and enter the correction time in %. The value you enter here is added to (for max. duration) or subtracted from (for min. duration) the ERT.
-
Real date + additional duration (for the maximum runtime only)
You can define a particular time until which the task must be finished. You can combine the following options:
- The number of days in the Additional Duration field.
- A specific time in the Finish Time input fields.
- A Time Zone object.
-
-
Optionally, define the Actions on Runtime Deviations.
Tip: Use Service Level Objective (SLO) objects to monitor runtimes and trigger actions in case of deviations.
Note: When "Cancel or quit this task if runtime has been exceeded" is used on a Workflow, all inactive and not started tasks are canceled. Currently active tasks are allowed to finish, and not canceled immediately.
-
In Forecast Settings select the end status that a task should return in case of forecast calculations.
Impact of the Check Interval in the MRT
The UC_JOB_CHECKINTERVAL variable defines the interval that is applied system-wide for checking times. This check is necessary when time dependencies are defined in objects. Take this interval into account when defining the MRT settings.
See also: