Configuring Control-M / Control-M (z) Schedulers

{"URL":["/*.*/AddScheduler_CA7"],"heroDescriptionIdentifier":"/*.*/AddScheduler_CM","customCards":[{"id":"ice_schedulers_OfflineOnline","title":"Taking Offline/Putting Online","type":"customize","url":"https://docs.automic.com/documentation/webhelp/english/ALL/components/TERMA_DOCU/*.*/AAI%20Guides/Content/Administration/Schedulers/admin_schedulers.htm","languages":["en-us"]},{"id":"ice_schedulers_deleting","title":"Deleting Schedulers","type":"customize","url":"https://docs.automic.com/documentation/webhelp/english/ALL/components/TERMA_DOCU/*.*/AAI%20Guides/Content/Administration/Schedulers/admin_schedulers.htm","languages":["en-us"]}]}
add Control-M scheduler,Control-M integration

This topic explains how toadd, configure, view, edit and delete a scheduler for Control-M / Control-M (z). You must add a new Control-M/Control-M (z) scheduler for each Control-M / Control-M (z) datacenter that you want to integrate into your AAI environment.

You can add Control-M / Control-M (z) schedulers before installing the Control-M Connector. However, you will not be able to use them until the Connector is up and running. For more information, see AAI Integration for Control-M and Setting Up the Control-M Connector.

Adding a Control-M / Control-M (z) Scheduler

Configuring a scheduler involves defining the following:

  • Scheduler-specific parameters: Name, type, connector and time zone.

  • Connection data to the corresponding workload automation engine.

  • Intervals, periods and times that AAI will apply to retrieve data.

Control-M schedulers can only be created through the Web UI.

To Add a Control-M Scheduler

  1. Go to System and click the Add Scheduler button.

  2. Enter a descriptive Name that the people who will work with the data from this scheduler can easily recognize. The name must be unique in your system.

  3. In Type select Control-M.

  4. Specify the following parameters:

    • If there is either a Control-M or a Control-M (z) connector registered, it is listed in the Connector dropdown list below.

    • Default Time Zone: Enter the time zone in which Control-M / Control-M (z) is located.

      Default: GMT

    • Database Type: Select the relevant database type.

    • JDBC URL: Enter the JDBC URL.

    • JDBC Driver: Enter the JDBC driver.

    • DB User: Enter the database user name

    • DB Password: Enter database user password

    • Control-M Data Center: Enter the relevant Control-M data center.

    • Job Definition Refresh Times: Select the times at which AAI should reload the job definitions. This ensures that AAI has the latest job data.

  5. Optionally, click Show Advanced to define additional parameters:

    • Projected Start Time Period (days)

      How far forward the connector should look for planned start times.

    • Historical Data Initial Load Period (days)

      How far back the connector should look the first time it fetches information.

      Default: One day

    • Event Polling Interval (seconds)

      Specific event polling interval for a particular scheduler.

    • Historical Data Load Batch (days): The number of days of data to be processed at a time. This parameter will noticeably affect performance; less days are more efficient.

  6. Click Save Changes. The new scheduler is added to the list of already connected systems. Initially, its status is In Progress until the scheduler is completely connected to AAI.

Viewing a Scheduler

Click an existing scheduler in the list. The dialog that is displayed provides the scheduler configuration data as you entered when adding it. For details about each field, see the Adding a Scheduler section in the documentation.

Updating the Job Definition Data

When you define a new scheduler, you specify the times at which the job definitions should be refreshed in the Job Definition Refresh Times field. You can also reload the job definitions manually at any time. Do the following:

  1. In the Schedulers list click the name of the scheduler.

  2. On the resulting dialog, click the Edit button to make the fields editable.

  3. In the Monitoring Details tab click the Update Now button that is under Job Definitions Updated.

    The last time that this data has been updated is displayed between the label and the button. This gives accurate information about the age of the data that AAI is surfacing.

Editing a Scheduler

  1. In the Schedulers list click the name of the scheduler.

  2. On the resulting dialog, click the Edit button to make the fields editable.

  3. This dialog provides the scheduler configuration data in two tabs, Monitoring Details and Connection Configuration, as you entered them when you added it. Makes your changes. For details about each field, see Adding a Scheduler .

Deleting a Scheduler

  1. In the Schedulers list select the scheduler that you want to delete.

  2. Click Delete on the dialog that is displayed.

See also: