Runtime Properties

As a developer and object designer, you can override the maximum and minimum runtime settings of a task in a Workflow using the Runtime properties tab.

Select Override Runtime Settings to display further options.

Activate Monitor MRT and/or Monitor SRT if you want to monitor the maximum and/or the minimum runtime. The following calculation methods are available:

  • Fixed value

    Select this option to display the input fields in which you can enter a fixed duration.

  • ERT + additional duration/ERT - additional duration

    Select this option to add or subtract the ERT duration time and enter the correction time in %.

    The value you enter here is added to (for max. duration) or subtracted from (for min. duration) the estimated run time

  • Real date + additional duration (for the maximum runtime only)

    You can define a particular time until which the task must be finished.

    You can combine the following options:

    •  The number of days in the Additional Duration field
    •  A specific time in the Finish Time input fields
    • A Time Zone object 

Actions on Runtime Deviations section

If you define a maximum or minimum runtime, you must also define the action to be executed in case the runtime exceeds the maximum or falls below the minimum.

You can either cancel or quit, or you can specify another task.

See also: