With this method a tendency of real runtimes (RRT) is more heavily emphasized than the calculation of the average. Also for this method the particular specified number of runs is used.
The number of calculated runs can be reduced so that existing tendencies with real runtimes can be taken into account in an overview.
To preserve a distance between estimated runtime and real runtime, it is possible to specify a correction value in percent. This value is added to the estimated runtimes. This allows the activation of an alarm only in extreme increases in the runtime.