Status of Jobstreams, Jobstream Runs and Job Runs

AAI displays the status of jobstreams, jobstream runs and job runs using various consistent visual aids through the user interface: Color coding, dotted/solid lines and icons. They are applied to the boxes in the multiple graphics and charts available in AAI that represent the runs. This topic explains the statuses and their visual aids.

Screenshot showing the Done, Running and Future statuses with their color codes and their sub-statuses.

Overall States

Jobstreams, jobstream runs and job runs can have one of the following three overall execution states:

  • Done

    Done state for jobstream run

    The boxes of runs that are done have a solid line.

  • Running

    Running state for jobstream run

    The boxes of runs that are still going on have a dotted line.

  • Future

    Future state for jobstream run

    The boxes of future runs have a dotted line.

Specific Status

AAI uses colors to provide detailed information about the status of the runs.

  • Green

    Green status, status for successful jobstream run, status for successful SLA

    Everything is okay, the SLA has been met/will be met.

    • (Done) The run has finished and has met the SLA.

    • (Running or Future) The run is still going on and Predicted on time so it will meet the SLA.

  • Red

    Red status, SLA breach on jobstream timelines, status for SLA breach, status for missed SLA

    Something is wrong. The SLA has not been met/will not be met.

    • (Done) The run has finished late, it has not met the SLA.

    • (Running or Future) The run is still going on or it has not started yet on and Predicted late. The SLA is jeopardized.

  • Orange

    Orange status, NPTF, NPTF root cause,

    Something is wrong. The run is not predicted to finish (NPTF). The AAI prediction engine can determine this for runs that are in progress as well as runs that have not started yet. When this happens, the AAI root cause analysis engine tries to determine the main reason that the jobstream run is not expected to finish, such as a start condition for one of the jobs cannot be met, a job in the jobstream is on hold, and so on. You can find out what the root cause for the NPTF status in the Gantt timeline for the jobstream run. For information, see Root Cause Analysis (Web Interface).

    This status applies to Running and Future runs only.

  • Yellow

    Yellow status, unknown status of jobstream run

    Something is wrong. AAI's analysis engine could find no reason why the jobstream fails, so AAI sets the jobstream status to Unknown. Unknown states are rare.

See also: