Job End Time Graph Report

The Job End Time Graph report provides information about execution end times of jobs over time. It clearly shows executions with irregular end times, which usually point to delayed executions.

Screesnhot of the job end time graph report

Each point in the graph is an execution. Click a point to display the Job Runs History Data table for that particular execution. This table is another of the available reports (see Job Run History Data Table Report). It shows dates, end times, types of delays and so forth.

Configuring the Report

You can configure this report to provide data for one or for more jobs. You should specify a data range of at least 30 days to get a meaningful set of data. The rest of the configuration options is self-explanatory.

Screenshot of the configuration dialog

Working with the Report

Click the icon on the top right corner of the panel to open a menu with the configuration options:

  • Edit

    Opens the configuration dialog, where you can edit the name, published status and filter criteria used in the report. For each data source you can add as many criteria as you need to narrow down the scope of the report. These criteria are combined using the OR operator.

  • Copy

    Creates a copy of the panel that you can then configure and adapt to your needs.

  • Move

    Moves the panel to a different page (dashboard).

  • Delete

    Deletes the panel.

  • Shorter/Taller

    Resizes the panel vertically.

  • Download

    Downloads the report and you can choose between multiple formats: PDF, XLSX, XLS, RTF, CSV, ODT, ODS, DOCX, PPTX

  • Get Link

    Creates a link to the report that you can share with other users.

See also:

Web UI Reports